Pilot in situ auger mixing treatment of a contaminated site. Part 3. Time-related performance
Authors:
- 1 April 2000
- journal article
- Published by Emerald Publishing in Proceedings of the Institution of Civil Engineers - Geotechnical Engineering
- Vol. 143 (2) , 103-114
Abstract
This paper, part 3 of a series of publications, presents a laboratory assessment of an in situ auger mixing treatment of a contaminated site up to 28 months after treatment. Part 1 detailed the site conditions and treatability study work and part 2 detailed the auger development and the site trial. The laboratory assessment was carried out in terms of physical and chemical properties, namely unconfined compressive strength, durability, permeability, compressibility, leachate pH, X-ray diffraction and scanning electron microscopy. The time-related behaviour of the seven mixes used was investigated and compared at two, 14 and 28 months after treatment and assessed in relation to the design criteria set at 28 days. This paper presents evidence of time-related behavioural changes and of the complexity and site-specific nature of the problem. It also emphasizes the time-liness of research work on long-term behaviour of stabilized/solidified contaminated ground to improve the efficiency and cost-effectiveness of the treatment methodology. This paper, part 3 of a series of publications, presents a laboratory assessment of an in situ auger mixing treatment of a contaminated site up to 28 months after treatment. Part 1 detailed the site conditions and treatability study work and part 2 detailed the auger development and the site trial. The laboratory assessment was carried out in terms of physical and chemical properties, namely unconfined compressive strength, durability, permeability, compressibility, leachate pH, X-ray diffraction and scanning electron microscopy. The time-related behaviour of the seven mixes used was investigated and compared at two, 14 and 28 months after treatment and assessed in relation to the design criteria set at 28 days. This paper presents evidence of time-related behavioural changes and of the complexity and site-specific nature of the problem. It also emphasizes the time-liness of research work on long-term behaviour of stabilized/solidified contaminated ground to improve the efficiency and cost-effectiveness of the treatment methodology.Keywords
This publication has 11 references indexed in Scilit:
- Laboratory-scale soil mixing of a contaminated siteProceedings of the Institution of Civil Engineers - Ground Improvement, 1999
- Time Effects of Three Contaminants on the Durability and Permeability of a Solidified SandEnvironmental Technology, 1998
- PILOT IN SITU AUGER MIXING TREATMENT OF A CONTAMINATED SITE. PART 2:SITE TRIAL.Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, 1998
- PILOT IN SITU AUGER MIXING TREATMENT OF A CONTAMINATED SITE. PART 1: TREATABILITY STUDY.Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, 1998
- Fundamental aspects of cement solidification and stabilisationJournal of Hazardous Materials, 1997
- Long-term behavior of a portland cement-electroplating sludge waste form in presence of copper nitrateJournal of Hazardous Materials, 1997
- Variability of field solidified wasteJournal of Hazardous Materials, 1997
- Summary of U.S. EPA Research on Solidified/stabilized Waste Form Long-Term Durability1996
- Long-term processes in a stabilized coal-waste block exposed to seawaterEnvironmental Science & Technology, 1991
- Long-term Monitoring of the Hazcon Stabilization Process At the Douglassville, Pennsylvania Superfund SiteJournal of the Air & Waste Management Association, 1991