Abstract
The disconnector switching operation in GIS not only generates very fast transient overvoltage (VFTO) in primary equipment, but also couples to the secondary system, which affects normal operation of the secondary equipment. In this study, aiming at the conducted disturbance caused by the disconnector switching operation of the 1,000-kV UHV GIS test circuit on the secondary cable, a broadband equivalent circuit model of the potential transformer and the grounding grid is proposed based on the vector fitting method and the impedance synthesis method, and the accuracy of the model is tested. On the basis of this model, the conducted disturbance voltage of the secondary cable core is obtained by combining the measured typical disturbance source waveform. The research results of the influencing factors of conducted disturbance show that the amplitude of the disturbance voltage generated by the capacitive conduction is higher than that generated by the resistive conduction, but the main frequency of the resistive conducted disturbance voltage is higher. The amplitude of the conducted disturbance voltage will decrease with the increase of the length of the cable and the length of the grounding wire. The single-ended grounding of the secondary cable shield at the GIS side will cause serious disturbance voltage. The research results of this study will be beneficial to the protection of secondary cable electromagnetic disturbance in the intelligent substation and have reference significance for the implementation of secondary equipment protection measures in the intelligent substation.Keywords
This publication has 12 references indexed in Scilit:
- Modularization of High Voltage Gas Insulated SubstationsIEEE Transactions on Industry Applications, 2020
- Research on modelling and solution of stochastic SCUC under AC power flow constraintsIET Generation, Transmission & Distribution, 2018
- Time and frequency characteristics of very fast transient overvoltage in ultra high voltage substationIEEE Transactions on Dielectrics and Electrical Insulation, 2017
- Study of Transient Enclosure Voltage Coupling to Secondary Cables in a Gas-Insulated SubstationIEEE Transactions on Power Delivery, 2017
- New development in relay protection for smart gridProtection and Control of Modern Power Systems, 2016
- Fast electromagnetic transient simulation for over‐voltages of transmission line by high order Radau method and V ‐transformationIET Generation, Transmission & Distribution, 2016
- A study on conducted disturbance below 150 kHz from commercial power-conditioning system2016
- Developments of Power System Protection and ControlProtection and Control of Modern Power Systems, 2016
- Macromodeling of Multiport Systems Using a Fast Implementation of the Vector Fitting MethodIEEE Microwave and Wireless Components Letters, 2008
- Application of vector fitting to state equation representation of transformers for simulation of electromagnetic transientsIEEE Transactions on Power Delivery, 1998