Cyclic hoist scheduling in large real-life electroplating lines
- 13 May 2006
- journal article
- research article
- Published by Springer Nature in OR Spectrum
- Vol. 29 (3) , 445-470
Abstract
No abstract availableKeywords
This publication has 29 references indexed in Scilit:
- Scheduling Single-Armed Cluster Tools With Reentrant Wafer FlowsIEEE Transactions on Semiconductor Manufacturing, 2006
- Scheduling analysis of time-constrained dual-armed cluster toolsIEEE Transactions on Semiconductor Manufacturing, 2003
- Multicyclic hoist scheduling with constant processing timesIEEE Transactions on Robotics and Automation, 2002
- The complexity of cyclic shop scheduling problemsJournal of Scheduling, 2002
- Cyclic scheduling of a hoist with time window constraintsIEEE Transactions on Robotics and Automation, 1998
- A genetic algorithm for a single hoist scheduling in the printed-circuit-board electroplating lineComputers & Industrial Engineering, 1997
- Single-wafer cluster tool performance: an analysis of the effects of redundant chambers and revisitation sequences on throughputIEEE Transactions on Semiconductor Manufacturing, 1996
- Schedule efficiency in a robotic production cellInternational Journal of Flexible Manufacturing Systems, 1995
- DETERMINING OPTIMAL CYCLIC HOIST SCHEDULES IN A SINGLE-HOIST ELECTROPLATING LINEIIE Transactions, 1994
- Sequencing of parts and robot moves in a robotic cellInternational Journal of Flexible Manufacturing Systems, 1992