IMS SWRO Kindasa — Two years of operational experience
Authors:
- Aziz H. GulamhuseinAGAziz H. Gulamhusein
- Ashraf S. Al Sheikh KhalilAKAshraf S. Al Sheikh Khalil
- Ibrahim A. FatahIFIbrahim A. Fatah
- Roman BodaRBRoman Boda
- Stefan RybarSRStefan Rybar
Open Access
- 1 October 2009
- journal article
- Published by Elsevier in Desalination and Water Treatment
- Vol. 10 (1-3) , 245-254
Abstract
Kindasa Water Services (KWS) derived its name “Kindasa” from the first seawater desalination plant built in Jeddah in the early 19th century. KWS is a limited liability company January 2000. KWS owns and operates desalination plants for supply of water to various industries, compounds etc. Recently KWS has built and is operating sea water reverse osmosis (SWRO) desalination plant in Jeddah Islamic Port with Hydranautics’s integrated membranes system (IMS®). KWS has selected hybrid pretreatment system consisting of conventional dual media filtration in conjunction with the latest state-of-the-art ultrafiltration (UF) process to produce stable RO feed water quality that remains unaffected by the seasonal changes of the seawater quality. KWS’s SWRO plant is the largest IMS operating already for two years in very difficult water. A pretreatment system was successfully commissioned in June 2006, and reverse osmosis section was commissioned in August-September 2006. There are different views in desalination ind...Keywords
This publication has 1 reference indexed in Scilit:
- UF/MF as RO pre-treatment: the real benefitDesalination, 2008