Comparing two methods to estimate lateral force acting on stabilizing piles for a landslide in the Three Gorges Reservoir, China
Authors:
- Chunmei ZhouCZChunmei Zhou
- Wei ShaoWSWei Shao
- Cees J. van WestenCWCees J. van Westen
- 1 May 2014
- journal article
- Published by Elsevier in Engineering Geology
- Vol. 173, 41-53
Abstract
No abstract availableThis publication has 34 references indexed in Scilit:
- Analysis of pile stabilized slopes based on soil–pile interactionComputers and Geotechnics, 2012
- Analysis and modeling of slope stability in the Three-Gorges Dam reservoir (China) — The case of Huangtupo landslideJournal of Mountain Science, 2011
- Criteria for rapid sliding I. A review of Vaiont caseEngineering Geology, 2010
- Implementing Hydrologic Boundary Conditions in a Multiphysics ModelJournal of Hydrologic Engineering, 2009
- Reply to “Comments on ‘Two-dimensional slope stability analysis by limit equilibrium and strength reduction methods’ by Y.M. Cheng, T. Lansivaara and W.B. Wei,” by J. Bojorque, G. De Roeck and J. MaertensComputers and Geotechnics, 2008
- Rainfall‐induced landslides and debris flowsHydrological Processes, 2007
- Two-dimensional slope stability analysis by limit equilibrium and strength reduction methodsComputers and Geotechnics, 2007
- On the evaluation of unsaturated flow in a natural slope in Rio de Janeiro, BrazilEngineering Geology, 2006
- Engineering geological problems in the Three Gorges Project on the Yangtze, ChinaEngineering Geology, 1999
- Piles Subjected to Lateral Soil MovementsJournal of Geotechnical and Geoenvironmental Engineering, 1997