On the Minimization of Uplift Payments for Multi-Period Dispatch
- 5 March 2020
- journal article
- research article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 35 (3) , 2479-2482
Abstract
In major electricity markets, the day-ahead market clearing model is sequentially solved considering the large scale of power grids. However, this practice produces uplift payments because the self-dispatch of market participants is calculated over the whole dispatch horizon. In this letter, the uplift payments incurred by the sequential dispatch manner are analyzed. A pricing model that reduces the uplift payments of the practical dispatch manner is presented.Keywords
Funding Information
- National Natural Science Foundation of China (51807014)
- China Southern Power Grid Company Limited (ZBKJXM20170082)
This publication has 5 references indexed in Scilit:
- A Unified Approach to Pricing Under NonconvexityIEEE Transactions on Power Systems, 2019
- Pricing Multi-period Dispatch Under Uncertainty2018
- Convex Hull Pricing in ElectricityMarkets: Formulation, Analysis, and Implementation ChallengesIEEE Transactions on Power Systems, 2015
- The Subgradient Simplex Cutting Plane Method for Extended Locational Marginal PricesIEEE Transactions on Power Systems, 2013
- Folk theorems on transmission access: Proofs and counterexamplesJournal of Regulatory Economics, 1996