The start-up and observation of the Li target in the EVEDA Li test loop
Authors:
- H. KondoHKH. Kondo
- T. KanemuraTKT. Kanemura
- T. FurukawaTFT. Furukawa
- Y. HirakawaYHY. Hirakawa
- F. GroeschelFGF. Groeschel
- E. WakaiEWE. Wakai
- 1 October 2014
- journal article
- Published by Elsevier in Fusion Engineering and Design
- Vol. 89 (7-8) , 1688-1693
Abstract
No abstract availableKeywords
This publication has 5 references indexed in Scilit:
- Completion of IFMIF/EVEDA lithium test loop constructionFusion Engineering and Design, 2012
- IFMIF/EVEDA lithium test loop: design and fabrication technology of target assembly as a key componentNuclear Fusion, 2011
- Present status of Japanese tasks for lithium target facility under IFMIF/EVEDAFusion Engineering and Design, 2011
- Design of purification loop and traps for the IFMIF/EVEDA Li Test Loop: Design of cold trapFusion Engineering and Design, 2011
- Safety concept of the IFMIF/EVEDA lithium test loopFusion Engineering and Design, 2011