Parallel dedicated machines scheduling with chain precedence constraints
Authors:
- Alessandro AgnetisAAAlessandro Agnetis
- Hans KellererHKHans Kellerer
- Gaia NicosiaGNGaia Nicosia
- Andrea PacificiAPAndrea Pacifici
- 1 September 2012
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 221 (2) , 296-305
Abstract
No abstract availableKeywords
This publication has 19 references indexed in Scilit:
- Scheduling three chains on two parallel machinesEuropean Journal of Operational Research, 2010
- A job-shop problem with one additional resource typeJournal of Scheduling, 2010
- Complexity of shop-scheduling problems with fixed number of jobs: a surveyMathematical Methods of Operations Research, 2007
- Minimum cost multi-product flow linesAnnals of Operations Research, 2006
- Review of properties of different precedence graphs for scheduling problemsEuropean Journal of Operational Research, 2002
- Task assignment and subassembly scheduling in flexible assembly linesIEEE Transactions on Robotics and Automation, 1995
- An efficient algorithm for the job-shop problem with two jobsComputing, 1988
- Letter to the Editor—A Graphical Approach to Production Scheduling ProblemsOperations Research, 1956
- A Non-Numerical Approach to Production Scheduling ProblemsJournal of the Operations Research Society of America, 1955
- A Decomposition Theorem for Partially Ordered SetsAnnals of Mathematics, 1950