The Necessity of Grade Estimation
- 1 January 2023
- book chapter
- Published by Springer Nature
- p. 1-6
Abstract
No abstract availableKeywords
This publication has 30 references indexed in Scilit:
- FuzzyKrig: a comprehensive matlab toolbox for geostatistical estimation of imprecise informationEarth Science Informatics, 2015
- Ordinary kriging for the estimation of vein type copper deposit: A case study of the Chelkureh, IranJournal of Mining and Metallurgy A: Mining, 2015
- Risk reduction in Sechahun iron ore deposit by geological boundary modification using multiple indicator KrigingJournal of Central South University, 2014
- Hybrid self-adaptive learning based particle swarm optimization and support vector regression model for grade estimationNeurocomputing, 2013
- Constrained multiple indicator kriging using sequential quadratic programmingComputers & Geosciences, 2012
- A hybrid neural networks-fuzzy logic-genetic algorithm for grade estimationComputers & Geosciences, 2012
- Application of Log Kriging on Estimated Reserves of the 10-9 Ore Body of Lutangba in the Gejiu Tin DepositsJournal of China University of Mining and Technology, 2007
- Localised Uniform Conditioning (LUC): A New Approach for Direct Modelling of Small BlocksMathematical Geology, 2006
- The theory of disjunctive Kriging and its application in grade estimate2004
- Kriging with imprecise (fuzzy) variograms. II: ApplicationMathematical Geology, 1990