Abstract
To obtain the best performance in wastewater treatment facilities, the reduction of pollutants through the degradation processes is of utmost importance. The treatment is conducted to determine the optimal wastewater load to be processed and the total time taken. The parameters observed include wastewater inflow and load, which are uncertain, therefore, they are considered as probabilistic factors. However, in the event where previous data is lost, sometimes due to infrastructural changes, a new decision-making tool is needed. This tool is introduced in this study, as a mathematical optimization model in the form of integrated fuzzy and probabilistic programming. This was developed to help in optimal decision making, under hazy and uncertain environment. Computational simulations were performed to evaluate the model with some secondary data that were collated from four facultative ponds in a wastewater facility located in Yogyakarta, Indonesia. The results showed that the introduced mathematical programming successfully generated the best decisions, as the loads include 1207.5 kg, 1205.0 kg, 1207.5 kg, and 1205.0 kg, with the processing time of 0.111598829, 0.098586243, 0.255010629, and 0.312537172 day, respectively, for the first, second, third, and fourth ponds.

This publication has 30 references indexed in Scilit: