From incineration to advanced fluid-bed gasification of waste

Authors:

Abstract
Energy recovery from municipal solid waste (MSW) is an important component of an integrated waste management strategy. This paper presents a critical assessment of traditional and more advanced process technologies for the thermal treatment of MSW. The study reports on the technical and economic performance of moving-grate incineration and fluidised-bed gasification processes for a medium-sized plant scale scenario of 100 kt/yr of waste input. Mass and energy balances of the processes are performed for generation of electric power using a steam turbine for the incineration process and a combined cycle gas turbine for the gasification process. The cost effectiveness of the two processes is assessed using a discounted cash flow analysis. The study shows that fluidised-bed gasification has better net electrical generation performance, with overall system efficiencies of 27% compared with 18% for incineration. In terms of economic performance, the gasification process has a lower capital cost (£26 million) and gate fee (£55/t) than incineration (£60 million and £80/t respectively). When the pre-treatment of waste was also taken into account, the fluid-bed gasification process still showed higher technical and economic competitiveness when compared with incineration.