Disassembly scheduling with capacity constraints: Minimizing the number of products disassembled
Authors:
- 1 September 2006
- journal article
- Published by SAGE Publications in Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture
- Vol. 220 (9) , 1473-1481
Abstract
Disassembly scheduling, one of the important operational problems in disassembly systems, is the problem of determining the timing and quantity of disassembling used or end-of-life products to satisfy the demand of their parts or components over a given planning horizon. This paper focuses on the case of single product type without parts commonality while the resource capacity restrictions are considered explicitly. The problem is formulated as an integer programming model with the objective of minimizing the number of products disassembled, and a solution algorithm is suggested after deriving its optimal solution properties. Computational experiments are done on various test problems, and the results show that the algorithm suggested in this paper gives optimal solutions for the test problems within a very short amount of computation time.Keywords
This publication has 18 references indexed in Scilit:
- A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraintsJournal of the Operational Research Society, 2006
- Two-phase heuristic for disassembly scheduling with multiple product types and parts commonalityInternational Journal of Production Research, 2006
- Disassembly scheduling: Integer programming modelsProceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 2004
- A two-stage heuristic for disassembly scheduling with assembly product structureJournal of the Operational Research Society, 2004
- Issues in environmentally conscious manufacturing and product recovery: a surveyComputers & Industrial Engineering, 1999
- State of the Art Literature Survey on Disassembly PlanningConcurrent Engineering, 1998
- Disassemblability of mechanical parts in automobile for recyclingComputers & Industrial Engineering, 1997
- Disassembly of multiple product structuresComputers & Industrial Engineering, 1997
- Disassembly of complex product structures with parts and materials commonalityProduction Planning & Control, 1997
- Scheduling disassemblyInternational Journal of Production Research, 1994