Research on Duration Prediction of the Coupled Task Set Based on the Grey System Theory
Authors:
- 1 November 2012
- journal article
- Published by Trans Tech Publications, Ltd. in Applied Mechanics and Materials
- Vol. 220-223, 169-173
Abstract
In order to solve the problem of duration predicting in the project with poor information, small sample and uncertainty, a method based on grey system theory is put forward to predicting the duration of the coupled task set. A grey duration prediction model GM(1,1) is built, and the accuracy of the model is tested through residual, degree of incidence and posterior variance. Finally, the feasibility of the prediction model is verified by a practical application case.Keywords
This publication has 2 references indexed in Scilit:
- Polynomial-time algorithms for scheduling problem for coupled-tasks in presence of treatment tasksElectronic Notes in Discrete Mathematics, 2010
- Project Scheduling using Dependency Structure MatrixInternational Journal of Project Management, 2005