ESGE/ESGENA guideline for process validation and routine testing for reprocessing endoscopes in washer-disinfectors, according to the European Standard prEN ISO 15883 parts 1, 4 and 5

Authors:
  • CNC. S. Neumann
    C. S. Neumann
  • HBH. Biering
    H. Biering
  • RBR. Blum
    R. Blum
  • VSV. Schmidt
    V. Schmidt
  • JRJ. F. Rey
    J. F. Rey
  • TCthe ESGE Guidelines Committee
    the ESGE Guidelines Committee

Abstract
1. Scope of this guideline 2. Quality management: the roles of validation and routine testing 3. Responsibilities and qualifications 4. Validation 4.1. Prerequisites 4.2. Installation qualification (IQ) 4.3. Operational qualification (OQ) 4.4. Performance qualification (PQ) 5. Routine testing 6. Frequency 6.1. Frequency of validation and revalidation 6.2. Frequency of routine testing 7. References 8. Appendices Appendix 1: Glossary Appendix 2.: Example of a checklist of prerequisites for installation of a washer-disinfector Appendix 3.: Example of a checklist for installation qualification Appendix 4.: Example of a checklist for operational qualification Appendix 5.: Example of a checklist for performance qualification Appendix 6.: Routine testing: checklist