Causality Analysis for Dynamic Quality Control in Construction
- 1 January 2013
- journal article
- Published by IACSIT Press in International Journal of Engineering and Technology
- p. 541-545
Abstract
Traditionally, construction quality control relies on final inspection and rework if the output is not fit-for-purpose. However, this reactive approach does not guarantee compliance with the requirements. By focusing on checking to completed product, a proactive approach to prevent poor quality is thus hampered. Studies have shown that poor quality of key resources commonly results in a number of production-related problems. The premise of this paper is that inadequate resources, such as deficient material, will not only result in unacceptable product quality but also in wasted time for handling and repair. It investigates the causal relationship between process input (i.e. resource) and output quality, as the basis for a pro-active control scheme. A field test was executed to look specifically at the quality of a prefabricated material, steel reinforcing bars (rebar), as it relates to its staging for final assembly. A discussion of correlations between attributes of input quality regarding rebar and the productivity of placement will complete the paperKeywords
This publication has 5 references indexed in Scilit:
- Relationship between quality management practices and innovationJournal of Operations Management, 2012
- AN ANALYSIS OF LAND MARK IMPACT FACTORS ON HIGH ‐RISE RESIDENTIAL BUILDINGS VALUE ASSESSMENTInternational Journal of Strategic Property Management, 2010
- Managing Performance in Construction2010
- Integration of reconfigurable inspection with stream of variations methodologyInternational Journal of Machine Tools and Manufacture, 2005
- Effects of Design‐Integrated Process Planning on Productivity in Rebar PlacementJournal of Construction Engineering and Management, 1994