A motion planning method for underactuated 3D overhead crane systems
Authors:
- 1 July 2015
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 4286-4291
Abstract
A novel motion planning method for 3D overhead crane system is proposed by analyzing the coupling relationship between the trolley motion and the load swing in this paper, which takes the consideration of system indexes and physical constraints. At first, we apply a three-segment acceleration trajectory planning method to 3D overhead cranes. Then, a parabola-based trajectory is presented to tackle the jerk problem of three-segment acceleration trajectory. Furthermore, the time of one transition stage is designed by the discussion on energy consumption and jerk. The method ensures the velocity, acceleration of the trolley, and the swing angles of the payload within the pre-set ranges. Moreover, when the trolley stops, zero residual oscillation of the payload is guaranteed. The superior performance of the proposed motion planning method is demonstrated by numerical simulations.Keywords
This publication has 8 references indexed in Scilit:
- Energy coupling output feedback control of 4-DOF underactuated cranes with saturated inputsAutomatica, 2013
- Adaptive sliding mode control of container cranesIET Control Theory & Applications, 2012
- New Energy Analytical Results for the Regulation of Underactuated Overhead Cranes: An End-Effector Motion-Based ApproachIEEE Transactions on Industrial Electronics, 2012
- Phase plane analysis based motion planning for underactuated overhead cranes2011
- A Motion Planning-Based Adaptive Control Method for an Underactuated Crane SystemIEEE Transactions on Control Systems Technology, 2011
- Adaptive Trajectory Tracking Control of Underactuated 3-dimensional Overhead Crane SystemsActa Automatica Sinica, 2010
- Motion planning for three-dimensional overhead cranes with high-speed load hoistingInternational Journal of Control, 2005
- Study of operator behavior, learning, and performance using an input-shaped bridge crane2005