Risk-Constrained Coordination of Cascaded Hydro Units With Variable Wind Power Generation
Authors:
- 1 May 2012
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Sustainable Energy
- Vol. 3 (3) , 359-368
Abstract
This paper presents a stochastic hourly coordination strategy for wind units and cascaded hydro generation as storage to firm up the hourly dispatch in a generating company (GENCO). The proposed strategy is based on the stochastic price-based unit commitment (Stochastic PBUC) formulation which includes wind energy imbalance charges. The forecast errors of electricity market price and wind speed are simulated with the Monte Carlo method via a scenario approach. The risk-aversion constraints are considered for limiting a GENCO's financial risks when considering uncertain wind power generation. The proposed optimization model is solved by mixed-integer linear programming (MIP) and illustrative examples examine the effectiveness of the proposed risk-based coordination model for optimizing a GENCO's payoff.Keywords
This publication has 22 references indexed in Scilit:
- Accelerating the Benders decomposition for network-constrained unit commitment problemsEnergy Systems, 2010
- Unit Commitment Risk Analysis of Wind Integrated Power SystemsIEEE Transactions on Power Systems, 2009
- Unit Commitment for Systems With Significant Wind PenetrationIEEE Transactions on Power Systems, 2009
- Security-Constrained Unit Commitment With Volatile Wind Power GenerationIEEE Transactions on Power Systems, 2008
- Statistical Analysis of Wind Power Forecast ErrorIEEE Transactions on Power Systems, 2008
- Utility Wind Integration and Operating Impact State of the ArtIEEE Transactions on Power Systems, 2007
- Risk-Constrained Bidding Strategy With Stochastic Unit CommitmentIEEE Transactions on Power Systems, 2007
- Strategic Bidding of Transmission-Constrained GENCOs with Incomplete InformationIEEE Transactions on Power Systems, 2005
- Optimal response of a power generator to energy, AGC, and reserve pool-based marketsIEEE Transactions on Power Systems, 2002
- Market Operations in Electric Power Systems2002