Casing Drilling in the San Juan Basin to Eliminate Lost Returns in a Depleted Coal Formation
Authors:
- 4 March 2008
- conference paper
- Published by Society of Petroleum Engineers (SPE)
Abstract
A casing drilling pilot program was conducted in the San Juan basin to determine if lost returns could be eliminated in a depleted coal formation. The pilot program proved that casing drilling can mitigate lost returns drilling through the coal and can be made economic in a low cost environment. The reduction in the amount of fluid lost should result in less damage to offset producing coal wells, resulting in higher ultimate recoveries. Development costs may also be reduced, by replacing directional wells drilled to avoid lost return zones, with lower cost vertical wells. A total of six wells were drilled with non-retrievable casing drilling bits. Two wells were drilled using a casing drilling bit on drillpipe (DP). Based on the bit performance four other wells were drilled with casing. Three wells drilled through the coal and had losses that were eliminated with casing drilling. One well experienced a bit failure and did not drill into the coal. The pilot program was completed with significant learnings. Losses were healed in the coal. A non-retrievable casing drilling system successfully drilled to the intermediate casing point without a trip. The bit design was changed significantly and resulted in 54% improvement in drill rate with instantaneous rates of penetration (ROP) similar to traditional polycrystalline diamond compact (PDC) bits. The initial casing design was modified to decrease vibration, and eliminate fatigue after a failure was experienced. The casing drilling bit was successfully drilled out with an air hammer and hammer bit. Other tools and techniques applied during the pilot program included cement stage tools, foam cement, and aerated fluids to reduce the equivalent circulating density (ECD) and to improve ROP.Keywords
This publication has 3 references indexed in Scilit: