A new calculation-experimental approach to improvement of the control of erosion-corrosion wear (ECW) at an NPP and the results of development of optimum technical solutions and methods of diagnostics, prediction, and managing of the erosion-corrosion processes are described. The possibility has been demonstrated of enhancing the reliability and the trouble-free operation of the power equipment of the II circuit of a power unit with a type-VVER reactor due to the implementation of the calculation-experimental monitoring of ECW of NPP pipelines.