An integrated approach for timetabling and vehicle scheduling problems to analyze the trade-off between level of service and operating costs of transit networks
Authors:
- Omar J. Ibarra-RojasOIOmar J. Ibarra-Rojas
- Ricardo GiesenRGRicardo Giesen
- Yasmin A. Rios-SolisYRYasmin A. Rios-Solis
- 1 December 2014
- journal article
- Published by Elsevier in Transportation Research Part B: Methodological
- Vol. 70, 35-46
Abstract
No abstract availableKeywords
Funding Information
- FONDECYT (1110720, 3140358)
- Volvo Research and Educational Foundations
- Centro de Desarrollo Urbano Sustentable
- Yasmin Rios-Solis acknowledges the Mexican Council of Science and Technology (I0002 PDCPN2013-01/213630)
This publication has 7 references indexed in Scilit:
- Synchronization of bus timetablingTransportation Research Part B: Methodological, 2012
- Optimal Multi-Vehicle Type Transit Timetabling and Vehicle SchedulingProcedia - Social and Behavioral Sciences, 2011
- Transit network timetabling and vehicle assignment for regulating authoritiesComputers & Industrial Engineering, 2010
- Regional Bus Operation Bi-level Programming Model Integrating Timetabling and Vehicle SchedulingSystems Engineering - Theory & Practice, 2007
- Iterated Local Search2006
- Adaptive weighted-sum method for bi-objective optimization: Pareto front generationStructural and Multidisciplinary Optimization, 2004
- Models and Algorithms for Single-Depot Vehicle SchedulingTransportation Science, 2001