Heterogeneous Evidential Reconstruction and Uncertainty-Aware Temporal Forecasting for Charging Station Cold-Start
Authors:
- Guo WentongGWGuo Wentong
- Xi GaoXGXi Gao
- Wenzhu XuWXWenzhu Xu
- Wenbin YaoWYWenbin Yao
- Fu GuFGFu Gu
- Sheng JinSheng Jin
Preprint
- 15 August 2026
- preprint
- Published by Elsevier in SSRN Electronic Journal
Abstract
Accurate forecasting of electric vehicle (EV) charging load is critical for distribution-network operation and charging-infrastructure planning, yet newly deployed or temporarily unobserved stations may have no historical load records, creating a challenging cold-start setting. Existing inductive forecasting methods can transfer information from observed locations to unobserved stations, but they generally provide deterministic reconstructions and do not explicitly account for how reconstruction reliability should influence subsequent temporal state evolution. To address these limitations, we propose the Heterogeneous Evidential Reconstruction Network (HERO-Net) for EV charging-load forecasting at cold-start stations with no historical load observations. HERO-Net first reconstructs the missing historical load representation of a target station by integrating geographic relationships, street-view imagery, and remote-sensing information within a multisource probabilistic graph framework. The reconstructed historical state is modeled as a latent Gaussian distribution, allowing the model to capture both the inferred load-related representation and its associated uncertainty. Based on this reconstruction, a routed uncertainty-modulated GRU combines the reconstructed evidence with an environment- and time-conditioned temporal prior and adaptively controls its contribution to hidden-state updating according to reconstruction uncertainty and prior-relative information, thereby improving subsequent charging-load forecasting. Extensive experiments across eight Chinese cities demonstrate that HERO-Net achieves state-of-the-art performance, reducing average MAE by 15.3% on unobserved target stations (63.80 kWh) and 35.3% on observed stations (58.62 kWh) compared to leading baselines. Latent representations achieve a strong reconstruction correlation (R2= 0.82), and estimated uncertainties demonstrate solid statistical calibration. Crucially for power grid operation, HERO-Net lowers peak load forecast error by 18.6% and ramp error by 17.8%, providing actionable, risk-aware guidance for smart grid dispatching and energy storage allocation.Keywords
This publication has 18 references indexed in Scilit:
- GridFusionX: Network-Aware Probabilistic Forecasting for Multi-Regional Power SystemsIEEE Transactions on Network Science and Engineering, 2026
- Empirical evidence of air pollution reduction from electric vehicle usage across Chinese citiesNature Cities, 2026
- Real-world charging data reveals spatial heterogeneity in electric vehicle charging station usageSustainable Cities and Society, 2025
- Multi-Encoder Spatio-Temporal Feature Fusion Network for Electric Vehicle Charging Load PredictionJournal of Intelligent & Robotic Systems, 2024
- DeepAR: Probabilistic forecasting with autoregressive recurrent networksInternational Journal of Forecasting, 2020
- Deep High-Resolution Representation Learning for Visual RecognitionIEEE Transactions on Pattern Analysis and Machine Intelligence, 2020
- T-GCN: A Temporal Graph Convolutional Network for Traffic PredictionIEEE Transactions on Intelligent Transportation Systems, 2019
- Impact of uncoordinated plug-in electric vehicle charging on residential power demandNature Energy, 2018
- A data-driven approach for characterising the charging demand of electric vehicles: A UK case studyApplied Energy, 2016
- The origins of krigingMathematical Geology, 1990