Innovative Top-Down Construction Method with a Sequential Peripheral Wall
- 5 January 2023
- journal article
- research article
- Published by Springer Nature in Geotechnical and Geological Engineering
- Vol. 41 (3) , 1777-1799
Abstract
No abstract availableKeywords
This publication has 33 references indexed in Scilit:
- Influence of Concrete Time-Dependent Effects on the Performance of Top-Down ConstructionJournal of Geotechnical and Geoenvironmental Engineering, 2015
- Case Study of Innovative Top-Down Construction Method with Channel-Type ExcavationJournal of Construction Engineering and Management, 2014
- Wall and Ground Movements due to Deep Excavations in Shanghai Soft SoilsJournal of Geotechnical and Geoenvironmental Engineering, 2010
- Modularized top‐down construction technique using suspended pour forms (modularized RC system downward, MRSD)The Structural Design of Tall and Special Buildings, 2009
- Three-Dimensional Responses of a Tied-Back Excavation through ClayJournal of Geotechnical and Geoenvironmental Engineering, 2005
- Database for Retaining Wall and Ground Movements due to Deep ExcavationsJournal of Geotechnical and Geoenvironmental Engineering, 2001
- Performance of Diaphragm Wall Constructed Using Top-Down MethodJournal of Geotechnical and Geoenvironmental Engineering, 1998
- Three-Dimensional Finite Element Analysis of Deep ExcavationsJournal of Geotechnical Engineering, 1996
- Application of the observational method to a deep basement excavated using the top-down methodGéotechnique, 1994
- Advantages and Limitations of the Observational Method in Applied Soil MechanicsGéotechnique, 1969