Abstract
Flood early warning systems have improved in hazard detection, forecasting, and warning dissemination, yet a persistent gap between warning availability and protective action remains. This paper examines how flood warning information leads to action in municipal preparedness and early response, asking why municipalities act differently within the same system. Drawing on a nationwide cross-sectional survey of 46 municipalities in Luxembourg, a setting in which nationally standardised warnings are received directly without an intermediate administrative tier, we analyse how organisational arrangements condition whether interpretation of warning information results in action. Municipalities do not enter warning situations from equivalent starting points. Most lack formal intervention plans (69.6%) and predefined warning thresholds linking alert levels to specific measures (67.4%), creating uneven pre-warning institutional conditions. Warning information is not used as a direct trigger for action but assessed in relation to local conditions before measures are defined. This interpretive process is consistent across municipalities, with most reporting use of multiple information sources (97.8%) and local observation (76%). However, interpretation does not lead to action with the same frequency. Frequent action is observed exclusively in municipalities combining both a documented plan and a predefined threshold, while those without either element report the lowest action frequency. Institutional arrangements shape how often similar interpretive practices lead to action. The governance structure, in which municipalities retain responsibility for preparedness while operational emergency response is centralised, favours confirmation-based responses over anticipatory activation. Standardising warning signals does not standardise municipal response.