Minimizing the Machine Processing Time in a Flow Shop Scheduling Problem under Piecewise Quadratic Fuzzy Numbers
Open Access
- 1 January 2022
- journal article
- research article
- Published by Wiley in Discrete Dynamics in Nature and Society
- Vol. 2022 (1)
Abstract
The piecewise quadratic fuzzy number (PQFN) can signify uncertain information that exists in scientific, technological, and engineering fields. Hence, it is a useful tool for describing information in scheduling problems. This study examines structured n‐job flow shop scheduling with fuzzy piecewise quadratic processing times and three machines. Close interval approximation of PQFNs is also offered as one of the most effective approximate intervals. Furthermore, the leasing cost of equipment is minimized with the use of a fuzzy style and an inventive algorithm. To demonstrate how the proposed framework can be used, a numerical illustration is provided.Keywords
Funding Information
- Qassim University
This publication has 22 references indexed in Scilit:
- A novel method for a fractional derivative with non-local and non-singular kernelChaos, Solitons & Fractals, 2018
- A new approach to two-machine flow shop problem with uncertain processing timesOptimization and Engineering, 2006
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristicsEuropean Journal of Operational Research, 2005
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988
- Fuzzy programming and linear programming with several objective functionsFuzzy Sets and Systems, 1978
- Optimal schedules for special structure flowshopsNaval Research Logistics Quarterly, 1975
- Decision-Making in a Fuzzy EnvironmentManagement Science, 1970
- Application of the Branch and Bound Technique to Some Flow-Shop Scheduling ProblemsOperations Research, 1965
- Fuzzy setsInformation and Control, 1965
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954