Semi-Fixed-Priority Scheduling: New Priority Assignment Policy for Practical Imprecise Computation
Authors:
- Hiroyuki ChishiroHCHiroyuki Chishiro
- Akira TakedaATAkira Takeda
- Kenji FunaokaKFKenji Funaoka
- Nobuyuki YamasakiNYNobuyuki Yamasaki
- 1 August 2010
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 23251271,p. 339-348
Abstract
This paper proposes semi-fixed-priority scheduling to achieve both low-jitter and high schedulability. Semi-fixed-priority scheduling is for the extended imprecise computation model, which has a wind-up part as a second mandatory part and schedules the part of each extended imprecise task with fixed-priority. This paper also proposes a novel semi-fixed-priority scheduling algorithm based on Rate Monotonic (RM), called Rate Monotonic with Wind-up Part (RMWP). RMWP limits executable ranges of wind-up parts to minimize jitter. The schedulability analysis proves that one task set is feasible by RMWP if the task set is feasible by RM. Simulation results show that RMWP has both lower jitter and higher schedulability than RM.Keywords
This publication has 7 references indexed in Scilit:
- Rate Monotonic vs. EDF: Judgment DayReal-Time Systems, 2005
- RT-frontier: a real-time operating system for practical imprecise computation2004
- OpenHRP: Open Architecture Humanoid Robotics PlatformThe International Journal of Robotics Research, 2004
- Optimal reward-based scheduling of periodic real-time tasks2003
- Competitive on-line scheduling of imprecise computationsIEEE Transactions on Computers, 1998
- Applying new scheduling theory to static priority pre-emptive schedulingSoftware Engineering Journal, 1993
- Scheduling Algorithms for Multiprogramming in a Hard-Real-Time EnvironmentJournal of the ACM, 1973