Abstract
Prolonged rainstorms pose substantial threats to transportation systems and expose the limitations of conventional post-disaster restoration, in which recovery actions are initiated only after the disaster has ended. This study proposes a during-disaster restoration (DDR) scheduling framework that initiates restoration while rainstorm-induced disruptions are still evolving. The framework combines a distributionally robust characterization of rainstorm conditions with restoration scheduling and demand loss evaluation. A case study on a real-world road network in Chengdu, China, evaluates the proposed framework. First, DDR consistently reduces travel demand loss and accelerates network recovery compared with post-disaster restoration. Second, rainstorm uncertainty can substantially affect restoration performance, resulting in considerable deviations from deterministic scenarios. Third, although rainstorm scale determines the overall magnitude of degradation, timely intervention remains the most effective operational strategy for mitigating disaster impacts. These findings provide practical support for transportation agencies in developing adaptive and resilient restoration strategies for extreme weather events.

This publication has 19 references indexed in Scilit: