Statistical process control subject to a labour resource constraint
Authors:
- Thomas R. RohlederTRThomas R. Rohleder
- Edward A. SilverESEdward A. Silver
- 1 January 2002
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 40 (14) , 3337-3356
Abstract
We develop a method for finding the economic sampling plan that minimizes expected total costs, subject to a constraint on labour time. We explicitly recognize the labour time required for sampling, investigation, extra processing effort per unit due to operating the process out of control, and the time to put the process back into control. These times, as well as the total production time, are frequently constrained by total available labour. With this constraint, we use a Lagrangian relaxation method to find the best sampling plan. Results of a numerical experiment show that the labour-constrained sampling plans and costs can differ substantially from the unconstrained solution. However, much of the cost penalty when labour is tightly constrained can be reduced with relatively small increases in total available labour time.Keywords
This publication has 16 references indexed in Scilit:
- Economic in-line inspection sampling strategy with learning effectsInternational Journal of Production Research, 2000
- The economic design of an X control chart recognizing process improvementInternational Journal of Production Research, 1999
- Economic Modeling for Statistical Process ControlJournal of Quality Technology, 1997
- Statistically Constrained Economic Design of the EWMA Control ChartJournal of Quality Technology, 1995
- Economic Design of Control Charts: A Literature Review for 1981–1991Journal of Quality Technology, 1994
- Determination of Optimal Design Parameters of an X̄ Control ChartJournal of the Operational Research Society, 1992
- Maintenance management decision makingEuropean Journal of Operational Research, 1992
- A simplified procedure for the economic design of X¯ -chartsInternational Journal of Production Research, 1990
- Economic design ofX¯ control charts for two manufacturing process modelsNaval Research Logistics Quarterly, 1985
- A Simplified Scheme for the Economic Design of X̄-ChartsJournal of Quality Technology, 1974