Integrated Lot Sizing in Serial Supply Chains with Production Capacities
- 1 November 2005
- journal article
- Published by Institute for Operations Research and the Management Sciences (INFORMS) in Management Science
- Vol. 51 (11) , 1706-1719
Abstract
We consider a model for a serial supply chain in which production, inventory, and transportation decisions are integrated in the presence of production capacities and concave cost functions. The model we study generalizes the uncapacitated serial single-item multilevel economic lot-sizing model by adding stationary production capacities at the manufacturer level. We present algorithms with a running time that is polynomial in the planning horizon when all cost functions are concave. In addition, we consider different transportation and inventory holding cost structures that yield improved running times: inventory holding cost functions that are linear and transportation cost functions that are either linear, or are concave with a fixed-charge structure. In the latter case, we make the additional common and reasonable assumption that the variable transportation and inventory costs are such that holding inventories at higher levels in the supply chain is more attractive from a variable cost perspective. While the running times of the algorithms are exponential in the number of levels in the supply chain in the general concave cost case, the running times are remarkably insensitive to the number of levels for the other two cost structures.Keywords
This publication has 18 references indexed in Scilit:
- Twenty Years of Strategic Distribution System Design: An Evolutionary PerspectiveInterfaces, 1995
- Global Supply Chain Management at Digital Equipment CorporationInterfaces, 1995
- Coordination of production and distribution planningEuropean Journal of Operational Research, 1994
- Improved Algorithms for Economic Lot Size ProblemsOperations Research, 1993
- A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0(n log n) or 0(n) TimeManagement Science, 1991
- An O(T2) Algorithm for the NI/G/NI/ND Capacitated Lot Size ProblemManagement Science, 1988
- Computational Complexity of the Capacitated Lot Size ProblemManagement Science, 1982
- Deterministic Production Planning: Algorithms and ComplexityManagement Science, 1980
- An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity ConstraintsManagement Science, 1978
- Deterministic Production Planning with Concave Costs and Capacity ConstraintsManagement Science, 1971