Fully integrated construction planning
Authors:
- Matan TamariMTMatan Tamari
- Shabtai IsaacSIShabtai Isaac
- 21 July 2023
- journal article
- research article
- Published by Elsevier in Automation in Construction
- Vol. 154
Abstract
No abstract availableKeywords
This publication has 35 references indexed in Scilit:
- 4D Relationships: The Missing Link in 4D SchedulingJournal of Construction Engineering and Management, 2016
- A BIM-based automated site layout planning framework for congested construction sitesAutomation in Construction, 2015
- Automating motion trajectory Of crane-lifted loadsAutomation in Construction, 2014
- Automated multi-objective construction logistics optimization systemAutomation in Construction, 2014
- Design for maintenance accessibility using BIM toolsFacilities, 2014
- Dynamic site layout planning through minimization of total potential energyAutomation in Construction, 2013
- Supporting domain experts to construct conceptual ontologies: A holistic approachJournal of Web Semantics, 2011
- Using visualization technologies for design and planning of a healthy construction workplaceConstruction Innovation, 2010
- Optimizing construction planning schedules by virtual prototyping enabled resource analysisAutomation in Construction, 2009
- Specifying parametric building object behavior (BOB) for a building information modeling systemAutomation in Construction, 2006