Solving the Economic Lot and Inspection Scheduling Problem using the Extended Basic Period approach under Power-of-Two policy
Authors:
- 1 January 2012
- journal article
- research article
- Published by Taylor & Francis in Journal of the Chinese Institute of Industrial Engineers
- Vol. 29 (1) , 43-60
Abstract
The focus of this study is to solve the Economic Lot and Inspection Scheduling Problem (ELISP) using the Extended Basic Period (EBP) approach under Power-of-Two (PoT) policy. The objective of the ELISP is to determine an optimal cycle time and an optimal production and inspection schedule so as to minimize the total cost per unit time. Under PoT policy, we formulate a mathematical model by taking into account the constraints for both production and inspection capacities. Also, we propose a Hybrid Genetic Algorithm (HGA) which is equipped with a search algorithm that not only seeks to improve solution quality, but also assures a feasible solution for each chromosome obtained from the evolutionary processes. Our numerical experiments show that the proposed HGA effectively solves the ELISP using the EBP approach, and its solutions outperform the solutions from the ELISP using the Common Cycle approach.Keywords
This publication has 38 references indexed in Scilit:
- A GENETIC ALGORITHM FOR SOLVING THE ECONOMIC LOT SCHEDULING PROBLEM WITH REWORKSJournal of the Chinese Institute of Industrial Engineers, 2009
- SOLVING THE ECONOMIC LOT SCHEDULING PROBLEM WITH IDENTICAL FACILITIES IN PARALLEL USING GENETIC ALGORITHMSJournal of the Chinese Institute of Industrial Engineers, 2008
- SOLVING THE JOINT REPLENISHMENT PROBLEM WITH WAREHOUSE-SPACE RESTRICTIONS USING A GENETIC ALGORITHMJournal of the Chinese Institute of Industrial Engineers, 2007
- Optimal inspection and economical production quantity strategy for an imperfect production processInternational Journal of Systems Science, 2006
- Integrated production-inventory models for imperfect production processes under inspection schedules☆Computers & Industrial Engineering, 2003
- ON THE FEASIBILITY TESTING OF THE ECONOMIC LOT SCHEDULING PROBLEM USING THE EXTENDED BASIC PERIOD APPROACHJournal of the Chinese Institute of Industrial Engineers, 2003
- A genetic algorithm for solving economic lot size scheduling problemComputers & Industrial Engineering, 2002
- Hybrid genetic algorithm for the economic lot-scheduling problemInternational Journal of Production Research, 2002
- A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection DelayIIE Transactions, 1989
- Economic Production Cycles with Imperfect Production ProcessesIIE Transactions, 1986