The master-slave paradigm in parallel computer and industrial settings
Authors:
- 1 December 1996
- journal article
- Published by Springer Nature in Journal of Global Optimization
- Vol. 9 (3) , 357-377
Abstract
No abstract availableKeywords
This publication has 14 references indexed in Scilit:
- Shop Problems With Two Machines and Time LagsOperations Research, 1996
- Minimizing makespan in hybrid flowshopsOperations Research Letters, 1994
- Job scheduling is more important than processor allocation for hypercube computersIEEE Transactions on Parallel and Distributed Systems, 1994
- Efficient Algorithms for Scheduling Semiconductor Burn-In OperationsOperations Research, 1992
- Scheduling independent jobs on partitionable hypercubesJournal of Parallel and Distributed Computing, 1991
- The performance of multiprogrammed multiprocessor scheduling algorithms1990
- Preemptive scheduling of independent jobs on a hypercubeInformation Processing Letters, 1988
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey1979
- Discussion: Sequencing n Jobs on Two Machines with Arbitrary Time LagsManagement Science, 1959
- Sequencing n Jobs on Two Machines with Arbitrary Time LagsManagement Science, 1959