Abstract
Power purchase agreements (PPAs) are increasingly adopted by large energy customers, such as data centers, to secure reliable, cost-effective, and timely access to electricity. Traditional PPAs are commonly structured on a pay-as-produced basis with annual supply–demand balancing. However, growing demand for clean and reliable electricity is driving a shift toward 24/7 hourly matching between supply and demand. Achieving this higher level of temporal granularity requires flexible resources, such as reservoir hydropower and energy storage, to complement variable renewable energy (VRE) resources like wind and solar. This work presents an integrated risk-aware optimization framework for designing 24/7 hybrid-resource PPAs that combine dispatchable resources with non-dispatchable renewables. The proposed framework jointly optimizes resource procurement, operational scheduling, and PPApricing to improve economic efficiency while ensuring the provider’s profitability. It further incorporates both supply risk and provider’s profit-loss risk through conditional value-at-risk (CVaR)-based formulations. Simulation results demonstrate the critical role of flexible resources, such as hydropower, in enabling cost-effective 24/7 energy delivery. Sensitivity analyses show how PPA delivery requirements, contract shortfall penalties, and reductions in resource capital costs affect PPA prices and resource procurement decisions. The results also indicate that delivery-risk-aware procurement can reduce the provider’s profit-loss risk compared with a supply-risk-neutral design, highlighting the value of explicitly accounting for risk in hybrid-resource PPA design.

This publication has 20 references indexed in Scilit: