Time Between Events Monitoring with Control Charts
Authors:
- Subhabrata ChakrabortiSCSubhabrata Chakraborti
- Nirpeksh KumarNKNirpeksh Kumar
- Athanasios C. RakitzisARAthanasios C. Rakitzis
- Ross S. SparksRSRoss S. Sparks
- 11 February 2023
- book chapter
- Published by Wiley
- p. 1-13
Abstract
No abstract availableThis publication has 27 references indexed in Scilit:
- Control Charts Based on the Exponential Distribution: Adapting Runs Rules for the t ChartQuality Engineering, 2013
- An ARL-unbiased design of time-between-events control charts with runs rulesJournal of Statistical Computation and Simulation, 2010
- Impact of model misspecification on the exponential EWMA charts: a robustness study when the time‐between‐events are not exponentialQuality and Reliability Engineering International, 2010
- Properties of the exponential EWMA chart with parameter estimationQuality and Reliability Engineering International, 2009
- Design of exponential control charts using a sequential sampling schemeIIE Transactions, 2006
- Parameter estimation and design considerations in prospective applications of theX¯ chartJournal of Applied Statistics, 2006
- Phase I control charts for times between eventsQuality and Reliability Engineering International, 2002
- Some effective control chart procedures for reliability monitoringReliability Engineering & System Safety, 2002
- Counted Data CUSUM'sTechnometrics, 1985
- A note on the intervals between coal-mining disastersBiometrika, 1979