An optimal algorithm for the basic period approach to the economic lot scheduling problem
Authors:
- C. RiggleCRC. Riggle
Abstract
No abstract availableKeywords
This publication has 15 references indexed in Scilit:
- A note of correction on “multi-product scheduling on a single machine”Omega, 1993
- Multi-product scheduling on a single machine: A case studyOmega, 1992
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot SizesOperations Research, 1987
- An extension of the extended basic period approach for economic lot scheduling problemsJournal of Optimization Theory and Applications, 1987
- Determination of economic production quantities for a two-product single machine systemInternational Journal of Production Research, 1984
- On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One MachineManagement Science, 1983
- The Economic Lot Scheduling Problem (ELSP): Review and ExtensionsManagement Science, 1978
- Note—A Note on the Single-Machine Multi-Product Lot Scheduling ProblemManagement Science, 1976
- An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling ProblemManagement Science, 1973
- A Dynamic Programming Approach to a Lot Size Scheduling ProblemManagement Science, 1966