Technical Paper Response: Determination of Manufacturing Cycle Time in Multi‐stage Production Systems
Authors:
- S.K. GoyalSGS.K. Goyal
- S. SinghalSSS. Singhal
- 1 March 1989
- journal article
- Published by Emerald Publishing in International Journal of Operations & Production Management
- Vol. 9 (3) , 60-63
Abstract
A corrected attempt to determine the size of in‐process inventory and the manufacturing lead time for an n‐stage production system is made. This corrects the earlier model developed by Ornek and Collier by accurately deriving the model for determining the manufacturing cycle time.Keywords
This publication has 4 references indexed in Scilit:
- The Determination of In‐Process Inventory and Manufacturing Lead Time in Multi‐Stage Production SystemsInternational Journal of Operations & Production Management, 1988
- A constant lot size model with equal and unequal sized batch shipments between production stagesEngineering Costs and Production Economics, 1986
- Optimizing multi-stage production with constant lot size and varying numbers of batchesOmega, 1980
- Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity ModelManagement Science, 1975