EQUATIONS OF THE TRAJECTORY OF THE HEAD'S MOTION IN THE GROUND WITH THE CONDITION OF ITS CORRECTION AND THEIR EXPERIMENTAL VERIFICATION
- 30 May 2026
- journal article
- Published by V. N. Karazin Kharkiv National University in Engineering
- p. 153
Abstract
The primary limitation of the method is the deviation of the tool trajectory from the design path due to various factors, such as soil heterogeneity and positioning inaccuracies. This restricts the application of the method to short distances of up to 15–20 m. To improve puncture accuracy, trajectory correction of the working body is proposed through adaptation of the tip (head) geometry. In the event of deviation from the design trajectory, a tip with an asymmetric geometry is employed, generating a controlled imbalance of interaction forces with the soil. This enables purposeful control of the head motion during puncturing, allowing trajectory correction without interrupting the process and without additional intervention in the system. The conducted research resulted in the development of a mathematical framework, including corresponding equations for trajectory correction of the working body. Key parameters such as soil type, its physical properties, and the inclination angle of the tip were taken into account. The obtained relationships allow prediction of system behavior and provide the capability to improve puncture accuracy under various operating conditions. Analysis of experimental data showed that the largest trajectory deviations occur at smaller inclination angles of the tip, whereas with increasing angle this effect gradually decreases. In addition, clay soils exhibit the smallest deviations compared to other soil types. In particular, at a distance of 10 m and an inclination angle of 25°, the deviation in sandy loam was about 40 mm, while in clay it was approximately 20 mm. When the angle increases to 55°, these values decrease to 14 mm in sandy loam and 13 mm in clay, respectively. Further increase of the angle to 70° demonstrated that the influence of the inclination angle becomes negligible and no longer significantly affects trajectory deviation. At the same time, the discrepancy between experimental results and theoretical calculations does not exceed 15%, indicating sufficient accuracy of the proposed model and confirming its adequacy under real operating conditions. The obtained results open new opportunities for improving the accuracy and efficiency of underground utility installation. In particular, they enable an increase in puncture length without loss of process controllability and expand the applicability of the static puncture method in complex engineering-geological conditions, ensuring more reliable and predictable execution of operations.Keywords
This publication has 12 references indexed in Scilit:
- Theoretical Analysis of Drilling Fluid Flow for Maxi-Horizontal Directional DrillingJournal of Pipeline Systems Engineering and Practice, 2024
- Determination of the regularities of the soil punching process by the working body with the asymetric tipEastern-European Journal of Enterprise Technologies, 2021
- Rheological Properties of Clay-Based Drilling Fluids and Evaluation of Their Hole-Cleaning Performances in Horizontal Directional DrillingJournal of Pipeline Systems Engineering and Practice, 2020
- A theoretical solution to predict pulling forces in horizontal directional drilling installationsTunnelling and Underground Space Technology, 2019
- Horizontal directional drilling pulling forces prediction methods – A critical reviewTunnelling and Underground Space Technology, 2017
- Fluidic Drag Estimation in Horizontal Directional Drilling Based on Flow EquationsJournal of Pipeline Systems Engineering and Practice, 2015
- Determination of Pipe Pullback Loads in Horizontal Directional Drilling Using an Advanced Computational Dynamic ModelJournal of Engineering Mechanics, 2014
- Theoretical model for calculating pulling loads for pipes in horizontal directional drillingTunnelling and Underground Space Technology, 2007
- Analysis of polyethylene pipe behaviour in horizontal directional drilling field testsCanadian Journal of Civil Engineering, 2005
- Mechanical modelling for pipes in horizontal directional drillingTunnelling and Underground Space Technology, 2001