Safety stock or safety lead time: coping with unreliability in demand and supply
- 26 January 2010
- journal article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 48 (24) , 7463-7481
Abstract
International audienceSafety stock and safety lead time are common measures used to cope with uncertainties in demand and supply. Typically, these uncertainties are studied in isolated instances, ignoring settings with uncertainties both in demand and in supply. The current literature largely neglects case study based contexts and, often, single product situations are investigated in which machine set-ups are not considered. Based on the problems and findings in a case study, we investigate the effects of safety stock and safety lead time on delivery performance in a multi-product setting. The outcomes of the extensive simulation study indicate that utilising a safety lead time results in a higher delivery performance where there is a variable supply, whereas having a safety stock results in a higher delivery performance where there is unreliable demand information. In contrast to earlier findings in the single product situation, this study shows that managers facing the combination of unreliability in demand information and supply variability in a multiple product situation should opt for a safety lead time as the most effective way of improving their delivery performanceKeywords
This publication has 26 references indexed in Scilit:
- A comparative study of exponential distribution vs Weibull distribution in machine reliability analysis in a CMS designComputers & Industrial Engineering, 2008
- Improving supply-chain performance by sharing advance demand informationEuropean Journal of Operational Research, 2002
- Uncertainty under MRP-planned manufacture: Review and categorizationInternational Journal of Production Research, 2002
- A model for comparing supply chain schedule integration approachesInternational Journal of Production Research, 2000
- A review of techniques for buffering against uncertainty with MRP systemsProduction Planning & Control, 2000
- Correlating MRP system nervousness with forecast errorsInternational Journal of Production Research, 1998
- A dynamic lot sizing model with exponential machine breakdownsEuropean Journal of Operational Research, 1997
- Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP systemInternational Journal of Production Research, 1997
- Exploiting timely demand information to reduce inventoriesEuropean Journal of Operational Research, 1996
- Combined demand and lead time uncertainty with back-ordering in a multi-level product structure environmentProduction Planning & Control, 1996