A Job-shop with an Energy Threshold Issue Considering Operations with Consumption Peaks
Authors:
- S. KemmoéSKS. Kemmoé
- D. LamyDLD. Lamy
- N. TchernevNTN. Tchernev
- 1 January 2015
- journal article
- Published by Elsevier in IFAC-PapersOnLine
- Vol. 48 (3) , 788-793
Abstract
No abstract availableThis publication has 13 references indexed in Scilit:
- An investigation into minimising total energy consumption and total weighted tardiness in job shopsJournal of Cleaner Production, 2014
- Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithmRobotics and Computer-Integrated Manufacturing, 2013
- Modelling of direct energy requirements in mechanical machining processesJournal of Cleaner Production, 2013
- Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shopsCIRP Annals, 2012
- Towards energy and resource efficient manufacturing: A processes and systems approachCIRP Annals, 2012
- A new approach to scheduling in manufacturing for power consumption and carbon footprint reductionJournal of Manufacturing Systems, 2011
- Unit process energy consumption models for material removal processesCIRP Annals, 2011
- A memetic algorithm for the job-shop with time-lagsComputers & Operations Research, 2008
- Environmentally benign manufacturing: Observations from Japan, Europe and the United StatesJournal of Cleaner Production, 2005
- Deterministic job-shop scheduling: Past, present and futureEuropean Journal of Operational Research, 1999