A Case Study in Scaleup for Multicontact Miscible Hydrocarbon Gas Injection
Author:
- 1 December 1998
- journal article
- Published by Society of Petroleum Engineers (SPE) in SPE Reservoir Evaluation & Engineering
- Vol. 1 (06) , 575-582
Abstract
Summary: We describe the strategy and results of scaleup done to simulate a multicontact miscible hydrocarbon water alternating gas (WAG) injection process. To adequately model both oil recovery and solvent retention in WAG, one must model three-phase flow including gas trapping. Scaleup of the multicontact miscible gas process is particularly difficult because of the very fine-scale structure of the gas fingers and the miscible front. The case studied is a heterogeneous mixed wet reservoir with a transition zone down to an underlying aquifer. The objective was to develop pseudo relative permeability curves and other parameters that are suitable for running in a full-field limited compositional model with three hydrocarbon components.Both history-matching and systematic approaches were used to generate pseudo relative permeability curves that reproduced results of high-resolution, fully compositional (FC) reference simulations. Dynamic pseudoization techniques were used to derive first guesses at pseudos, but required further calibration to reproduce reference simulations successfully. In matching incremental miscible gas/oil recovery timing and solvent retention, varying three-phase water relative permeability was much more effective than varying the mixing parameter.The predictive capability of pseudos was tested for changes with respect to slug size, WAG ratio, and solvent enrichment. Pseudos derived for one pattern or cross section were tested in other patterns or cross sections. Pseudos worked well with respect to changes in WAG ratio, fairly well with respect to changes in solvent enrichment, and moderately well for changes in slug size. They were less robust with respect to changes in description.Keywords
This publication has 20 references indexed in Scilit:
- General Three-Phase Relative Permeability Model for Prudhoe BaySPE Reservoir Engineering, 1997
- Performance Analysis and Optimization of the Prudhoe Bay Miscible-Gas ProjectSPE Reservoir Engineering, 1995
- Core Acquisition and Analysis for Optimization of the Prudhoe Bay Miscible-Gas ProjectSPE Reservoir Engineering, 1995
- Effect of Phase Behavior on Bypassing in Enriched GasfloodsSPE Reservoir Engineering, 1994
- Reservoir Description Detail Required To Predict Solvent and Water Saturations at an Observation WellSPE Reservoir Engineering, 1994
- Effect of Gas Enrichment and Numerical Dispersion on Enriched-Gas-Drive PredictionsSPE Reservoir Engineering, 1990
- Scaling Up Heterogeneities With PseudofunctionsSPE Formation Evaluation, 1990
- Three-Parameter Modification of the Peng-Robinson Equation of State To Improve Volumetric PredictionsSPE Reservoir Engineering, 1988
- A New Two-Constant Equation of StateIndustrial & Engineering Chemistry Fundamentals, 1976
- Calculating Viscosities of Reservoir Fluids From Their CompositionsJournal of Petroleum Technology, 1964