Container vessel scheduling with bi-directional flows
Authors:
- 5 June 2006
- journal article
- research article
- Published by Elsevier in Operations Research Letters
- Vol. 35 (2) , 186-194
Abstract
No abstract availableKeywords
This publication has 14 references indexed in Scilit:
- A computer-based decision support system for vessel fleet scheduling—experience and future researchDecision Support Systems, 2004
- Ship Routing and Scheduling: Status and PerspectivesTransportation Science, 2004
- On the Effectiveness of Zero-Inventory-Ordering Policies for the Economic Lot-Sizing Model with a Class of Piecewise Linear Cost StructuresOperations Research, 2002
- Economic lot-sizing with remanufacturing optionsIIE Transactions, 2001
- The reverse Wagner/Whitin model with variable manufacturing and remanufacturing costInternational Journal of Production Economics, 2001
- Supply-Chain Management for Recoverable Manufacturing SystemsInterfaces, 2000
- Production planning and control for remanufacturing: industry practice and research needsJournal of Operations Management, 2000
- Remanufacturing planning for the reverse Wagner/Whitin modelsEuropean Journal of Operational Research, 2000
- Quantitative models for reverse logistics: A reviewEuropean Journal of Operational Research, 1997
- A Solution to the Multiple Set-Up Problem with Dynamic.DemandIIE Transactions, 1989