A complex time based construction heuristic for batch scheduling problems in the chemical industry
Authors:
- Rainer E. BurkardRBRainer E. Burkard
- Johannes HatzlJHJohannes Hatzl
- 1 October 2006
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 174 (2) , 1162-1183
Abstract
No abstract availableThis publication has 19 references indexed in Scilit:
- Review, extensions and computational comparison of MILP formulations for scheduling of batch processesComputers & Chemical Engineering, 2005
- Planning and scheduling in the process industryOR Spectrum, 2002
- Makespan minimization for chemical batch processes using non-uniform time gridsComputers & Chemical Engineering, 2002
- LP-based heuristics for scheduling chemical batch processesInternational Journal of Production Research, 2000
- Effective Continuous-Time Formulation for Short-Term Scheduling. 1. Multipurpose Batch ProcessesIndustrial & Engineering Chemistry Research, 1998
- Effective Continuous-Time Formulation for Short-Term Scheduling. 2. Continuous and Semicontinuous ProcessesIndustrial & Engineering Chemistry Research, 1998
- Scheduling of a multi-product batch process in the chemical industryComputers in Industry, 1998
- A process scheduling problem arising from chemical production planningOptimization Methods and Software, 1998
- Mathematical programming formulation for scheduling of batch operations based on nonuniform time discretizationComputers & Chemical Engineering, 1997
- A general algorithm for short-term scheduling of batch operations—I. MILP formulationComputers & Chemical Engineering, 1993