Abstract
In today's dynamic battles, where quick response and precise actions are the key to victory, optimizing the process of evacuating damaged equipment from the combat zone is of paramount importance. Effective management of this process can make a dramatic difference, ensuring the safety of personnel, minimizing the loss of equipment and preserving the combat power of our troops. In the ever-changing landscape of modern warfare, optimizing the evacuation of equipment is not only an operational necessity, but also a moral imperative. By simplifying this process, we protect our personnel, conserve resources, and ensure that our forces remain at peak combat strength, which ultimately contributes to victory on the battlefield. However, a thorough assessment of the existing repair system during Russia's war against Ukraine revealed a critical flaw: damaged equipment suffers excessive downtime due to inefficient task allocation between repair units. This state of affairs indicates the existence of an inappropriate distribution of the capabilities of repair and restoration units between the actual number of people who need to evacuate damaged weapons and equipment, which subsequently leads to significant delays in its evacuation and restoration and entails delays in restoring the combat capability of troops (forces). Reducing the downtime of equipment damaged in combat is a critical task for ensuring the combat capability of troops. The sooner the damaged equipment is evacuated from the combat zone and repaired, the sooner it can return and restore its combat potential. Thus, for the first time, using the improved model of the RMMO with waiting, the article substantiates recommendations for reducing the total evacuation time of disabled weapons and military equipment by changing the approaches to the distribution of evacuation means between repair and restoration units. The application of these proposals made it possible to reduce the waiting time for evacuation by 35.7% of the total evacuation time, which can be used as an example in further research to develop practical recommendations for the appropriate distribution of mobile means of repair and maintenance of military equipment.

This publication has 4 references indexed in Scilit: