Dynamic rescheduling that simultaneously considers efficiency and stability
- 1 March 2004
- journal article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 46 (1) , 1-15
Abstract
No abstract availableKeywords
This publication has 16 references indexed in Scilit:
- Genetic algorithm based scheduling in a dynamic manufacturing environment2002
- Customer Order Scheduling in a General Job Shop Environment*Decision Sciences, 1998
- A multi-objective genetic local search algorithm and its application to flowshop schedulingIEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews), 1998
- A study of due-date assignment rules with constrained tightness in a dynamic job shopComputers & Industrial Engineering, 1996
- Analysis of periodic and event-driven rescheduling policies in dynamic shopsInternational Journal of Computer Integrated Manufacturing, 1992
- Simulation studies of multilevel dynamic job shop scheduling using heuristic dispatching rulesJournal of Manufacturing Systems, 1992
- Integration of priority dispatching and due-date assignment in a job shopInternational Journal of Systems Science, 1988
- Sequencing Rules and Due-Date Assignments in a Job ShopManagement Science, 1984
- The Effect of Workload Dependent Due-Dates on Job Shop PerformanceManagement Science, 1983
- A Comparison of Due-Date Selection RulesA I I E Transactions, 1981