Combining Postprocessed Ensemble Weather Forecasts and Multiple Hydrological Models for Ensemble Streamflow Predictions
Authors:
- 1 January 2020
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Hydrologic Engineering
- Vol. 25 (1)
Abstract
Ensemble streamflow prediction (ESP), which is generally achieved by combining ensemble weather forecast (EWF) and hydrological model, has a wide application. However, the EWF is biased and underdispersive, and therefore cannot be directly used to build ESP. The skillful forecast lead time of EWF in ESP needs to be determined, and the uncertainty of hydrological models is also nonnegligible. In this study, raw meteorological forecasts are corrected by the generator-based postprocessing method (GPP), the skillful forecast lead time of EWF is determined by comparison with a historical resampling method, and hydrological model uncertainty is investigated using Bayesian model average. The results indicate that GPP can significantly reduce bias and improve dispersion. With a superior postprocessing method, the skillful forecast lead times are 9 and 14 lead days for precipitation and temperature, respectively. With the synthetic effects of precipitation and temperature, the ESP has a skillful forecast lead time for around 10 lead days in terms of both deterministic and probabilistic metrics. However, the skillful lead time may be shortened to 5 days for flood season streamflow predictions. In addition, the hydrological model is an important source of uncertainty in ESPs, especially when evaluating ESPs in terms of probabilistic metrics. The ESP based on a combination of multiple hydrological models outperforms that based on a single model. Overall, this study indicates that the combination of postprocessed EWFs and multiple hydrological models is an effective approach for ESPs.Keywords
This publication has 69 references indexed in Scilit:
- Deterministic and ensemble‐based prediction of Adriatic Sea sirocco storms leading to ‘acqua alta’ in VeniceQuarterly Journal of the Royal Meteorological Society, 2011
- Evaluation of seasonal and spatial variations of lumped water balance model sensitivity to precipitation data errorsJournal of Hydrology, 2006
- Towards the characterization of streamflow simulation uncertainty through multimodel ensemblesJournal of Hydrology, 2004
- Improvement of a parsimonious model for streamflow simulationJournal of Hydrology, 2003
- GR3J: a daily watershed model with three free parametersHydrological Sciences Journal, 1999
- Methods for combining the outputs of different rainfall–runoff modelsJournal of Hydrology, 1997
- Optimal use of the SCE-UA global optimization method for calibrating watershed modelsJournal of Hydrology, 1994
- The Xinanjiang model applied in ChinaJournal of Hydrology, 1992
- Estimating the Dimension of a ModelThe Annals of Statistics, 1978
- A new look at the statistical model identificationIEEE Transactions on Automatic Control, 1974