An electricity market model to estimate the marginal value of wind in an adapting system
Authors:
- 1 January 2006
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 138 (19325517) , 8 pp.
Abstract
In this paper a stochastic fundamental electricity market model is presented. The model's principle is cost minimization by determining the marginal system costs mainly as a function of available generation and transmission capacities, primary energy prices, plant characteristics and electricity demand. To obtain appropriate estimates of the marginal value of wind in an adapting system notably reduced efficiencies at part load, start-up costs and reserve power requirements are taken into account. The intermittency of wind is covered by a stochastic recombining tree and the system is considered to adapt on increasing wind integration over time by endogenous modeling of investments in thermal power plants. Exemplary results are presented for a German case studyKeywords
This publication has 5 references indexed in Scilit:
- The economics of large-scale wind power in a carbon constrained worldEnergy Policy, 2006
- Uncertainty in the Electric Power Industry2005
- Modernisation of existing and new construction of power plants in Germany: results of an optimisation modelEnergy Economics, 2005
- The Value of Wind Energy as a Function of Wind CapacityThe Electricity Journal, 2004
- Review on methods of generation scheduling in electric power systemsElectric Power Systems Research, 2004