Inventory Control when the Lead‐time Changes
Author:
- 1 January 2011
- journal article
- Published by SAGE Publications in Production and Operations Management
- Vol. 20 (1) , 72-80
Abstract
A single‐echelon inventory system with continuous review and Poisson demand is considered. There are standard linear holding and backorder costs but no ordering or set‐up costs. We study a change in the lead‐time, which is rather typical in connection with application of a Just‐In‐Time philosophy. Our main focus is a lead‐time decrease but we also consider a lead‐time increase. Due to the lead‐time change, the optimal steady state solution will also, in general, change. We consider the transient problem of minimizing the costs when bringing the system from its original steady state to the new steady state.Keywords
This publication has 9 references indexed in Scilit:
- Inventory Management for Customers with Alternative Lead TimesProduction and Operations Management, 2009
- A heuristic for triggering emergency orders in an inventory systemEuropean Journal of Operational Research, 2007
- An inventory model with Poisson demands and emergency ordersInternational Journal of Production Economics, 1998
- Inventory Control with Information About Supply ConditionsManagement Science, 1996
- An Intermediate Course in Probability1995
- Using Time to Generate Corporate RenewalInternational Journal of Operations & Production Management, 1994
- Changing the givens in modelling inventory problems: the example of just-in-time systemsInternational Journal of Production Economics, 1992
- A Continuous Review Model for an Inventory System with Two Supply ModesManagement Science, 1988
- Investing in Reduced Setups in the EOQ ModelManagement Science, 1985