Production rate and lot-size dependent lead time reduction strategies in a supply chain model with stochastic demand, controllable setup cost and trade-credit financing
Authors:
- 2 March 2021
- journal article
- research article
- Published by EDP Sciences in RAIRO - Operations Research
- Vol. 55, S1469-S1485
Abstract
This study explores simultaneous reduction strategies of lead time and setup cost in a two-stage supply chain model under trade-credit financing. Lead time depends on a variable production rate and lot size. It consists of setup, production, and transportation time which are shortened to reduce lead time. Although double safety factors are considered to avoid stock-out; but still backorders take place as the demand during the lead time is stochastic. Setup cost is reduced by including an extra investment cost. In addition, the vendor offers a fixed credit period to the buyer to settle the account. The objective is to minimize the integrated expected total cost and optimize the order quantity, number of deliveries, setup and transportation time, setup cost, safety factor for the first batch, and the production rate. A multi-variable optimization technique is used for these purposes. Furthermore, a numerical example together with managerial insights is provided for the establishment and applicability of the proposed model. The numerical results show that the introduction of setup cost reduction and trade-credit financing along with lead time reduction is more beneficial by means of integrated expected total cost reduction.Keywords
This publication has 43 references indexed in Scilit:
- Supply chain coordination with controllable lead time and asymmetric informationEuropean Journal of Operational Research, 2012
- An optimal shipment strategy for imperfect items in a stock-out situationMathematical and Computer Modelling, 2011
- An economic order quantity model of imperfect quality items with partial backloggingInternational Journal of Systems Science, 2011
- Coordination between vendor and buyer considering trade credit and items of imperfect qualityInternational Journal of Production Economics, 2010
- An integrated vendor–buyer inventory model with backorder price discount and effective investment to reduce ordering costComputers & Industrial Engineering, 2009
- A note on integrated single vendor single buyer model with stochastic demand and variable lead timeInternational Journal of Production Economics, 2008
- Coordinating a two-level supply chain with delay in payments and profit sharingComputers & Industrial Engineering, 2006
- Lot size reorder point inventory model with controllable lead time and set-up costInternational Journal of Systems Science, 2002
- Lot size dependent lead times in a Q,R inventory systemInternational Journal of Production Research, 1995
- Economic Production Lot Size Model with Variable Production Rate and Imperfect QualityJournal of the Operational Research Society, 1994