Project scheduling algorithms for re-layout projects
Authors:
- 1 January 1998
- journal article
- research article
- Published by Taylor & Francis in IIE Transactions
- Vol. 30 (1) , 91-99
Abstract
The most common type of facility layout project is re-layout, which involves rearranging existing equipment in a facility. Project schedule development is an often overlooked yet critical portion of a facility re-layout project. When developing a re-layout project schedule, departments cannot be moved into their final locations until all previous occupants have moved. By incurring the cost of moving departments to temporary locations, it is possible to reduce the overall project duration. A two-criteria mixed-integer programming model is developed that finds the schedule minimizing department move costs subject to precedence constraints. An efficient algorithm uses this model to find all non-dominated time and cost solutions to the re-layout problem. Modifications to the basic model and algorithm handle resource constraints and turnaround space constraints. The algorithm and its modifications are demonstrated on an actual re-layout project.Keywords
This publication has 8 references indexed in Scilit:
- The facility layout problem: Recent and emerging trends and perspectivesJournal of Manufacturing Systems, 1996
- Static and Dynamic Layout Problems with Varying AreasJournal of the Operational Research Society, 1994
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling ProblemManagement Science, 1992
- Some efficient multi-heuristic procedures for resource-constrained project schedulingEuropean Journal of Operational Research, 1990
- The facility layout problemEuropean Journal of Operational Research, 1987
- A computer model for investigating the relayout of batch production areasInternational Journal of Production Research, 1985
- A HEURISTIC ALGORITHM FOR RESOURCE LEVELING IN MULTI‐PROJECT, MULTI‐RESOURCE SCHEDULINGDecision Sciences, 1975
- A Horizon-Varying, Zero-One Approach to Project SchedulingManagement Science, 1974