Abstract
This study examines the problem of facility location and vehicle routes determination in supply chain system periodically. The problem is determining the location and route to meet the supply of commodity to the power plant that taken from the case of an electricity company in Indonesia. In this study, the problem is called Periodic Location Routing Problem (PLRP). Periodic Location Routing Problem is a non-polynomial hard problem (NP-hard), if locations considered is increase, the computation time used is increasing exponentially. Therefore, to solve a large-scale of this problem, a local search algorithm is proposed. Local search is a very simple metaheuristic algorithm. To explore the solution space for the problem, this algorithm will use the relocation operator. The results of computational experiments from 10 instances indicate that the results of the solution have a small standard deviation with short computing time in less than 2 hours.

This publication has 18 references indexed in Scilit: