The Met Office runs an operational storm surge forecast system for the UK based on a 7 km configuration of NEMO forced by wind and air pressure from Met Office global atmosphere forecasts. The water level forecast comprises the surge residual from the model added to the harmonic tide prediction derived from observations. A new automated bias correction has been added to the system to improve forecast performance. The correction has 3 components: a mean sea level correction to account for different mean sea levels in the forced and unforced model runs, a monthly correction to account for the atmospheric component included in harmonic tide predictions, and an empirical constant correction to account for sea level rise and other effects not currently included in the surge model. The correction scheme is shown to significantly improve the overall forecast skill compared to the original uncorrected forecast. The number of forecasts that fall outside the target 20 cm accuracy is reduced from an average of 17% (whole tide cycle) and 22% (high waters only) to less than 6% (in both cases). The average RMS error is reduced from 14 cm (whole tide cycle) and 15 cm (high waters) to 9 cm (in both cases) and the average bias is reduced from 11 cm to 1cm (all tide cycle) and 13 cm to 3 cm (high waters). The correction was added to the operational system in August 2024.